MODIFICATION, VALVE STAND.
Replacement of the originally used, but no longer available leak testers to the new type for the complete system.
Following scope of supply and services for 1 pair of bases:
- 2 pcs. Leak tester
- 2 sets of required fittings
- 2 x radiation protection
- New operating instructions
- Modification of documentation (scheme, circuit diagram)
- Info regarding device settings (measurement time, test time)
- Piping modification information (without field wiring)
Exclusion of supply and services:
- Pipe material including fastening material for vent line 1 line
- Installation and commissioning on site
The pipe routing to the vent line 1 line has to be be decided on site and therefore is not included in the scope of delivery.